Leads/d8740b20
Approved · planning

SR 686 Pond 9 CMAC Allocation - Port Redwing Materials

SR 686, Clearwater, FL, 33763

Load estimate pending
Lifecycle
Permitted as of Mar 25, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

SR 686 Pond 9 CMAC Allocation - Port Redwing Materials

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/25/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
State of Florida Department of Transportation
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24SWFWMD_ERP
    Captured SWFWMD_ERP_932667 from swfwmd_erp
  2. 2026-05-24SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_932667_d8740b20 from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Drainage features (5)
  • 1 wet detention pond (Pond No. 9) with outfall structure including 12-inch actuated butterfly valve
  • 9-inch weir
  • 18x60.5-inch fiberglass skimmer
  • 24-inch outlet pipe
  • and trash grate
Plan notes: These sheets are pond structure detail sheets (Sheet 3 of 9) for Pond No. 9 on SR 686 in Pinellas County, Florida; no earthwork quantities or utility lengths are shown. The project financial ID is 256994-1-52-01.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
CITY OF CLEARWATER TRANSFER STATION · Clearwater
One-way
4.1 mi
Round trip
8.2 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
21.8 mi
Round trip
43.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa21.8 mi43.5
quarryCaloosa MaterialsRuskin28.2 mi56.4
quarryCentral State Aggregates LLCZephyrhill34.9 mi69.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 34.9 mi69.7
sand pitCounty Line MineSpring Hill35.4 mi70.8
quarryBrooksville QuarryBrooksville48.1 mi96.2
quarryBrooksville South Cement PlantBrooksville48.8 mi97.6
transfer stationCITY OF CLEARWATER TRANSFER STATIONClearwater4.1 mi8.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
State of Florida Department of Transportation
Engineer of Record
National Stormwater Trust

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9326672026-05-24Open ↗
swfwmd_erp_plansSWFWMD_PLANS_932667_d8740b202026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
City
Clearwater
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d8740b20