Long Bar Pointe 1 Modification

SWFWMD ERP — site address pending

Qualifying 55
HotStrongWarmQualifying
permit issuedunknownother

Score breakdown — 55/100

+
3 Contractors Linked

Known companies — contact info available for outreach

Location

Exact project coordinates not available — pin shows approximate county-level area

Scope signals

Permit types
SWFWMD ERP (Individual)
Permit status
Issued
Est. notes
These are drainage record drawings (as-built) for Long Bar Pointe Phase 1B; all improvements noted as constructed in substantial conformance with approved plans per Cross Surveying, LLC on 02/06/20. The stormwater pond (lake) is a private facility to be dedicated to the homeowners association/community development district for perpetual maintenance. CY
Est. source
swfwmd_erp_plans CY
Est. drainage features
1 private stormwater facility/lake (wet detention pond),1 outfall control structure (CS1),numerous valley gutter inlets (CB series,approximately 106 numbered),numerous grate inlets (CB series),junction boxes (JB series,approximately 42 numbered),1 public flowage easement tract CY
Est. extraction method
claude_vision CY
Est. utility lengths lf
[object Object] CY
Jurisdiction
Manatee, FL

Company roles

Source records

swfwmd_erpSWFWMD_ERP_926305
View Source
swfwmd_erp_plansSWFWMD_PLANS_926305_d8316e50
View Source