Leads/d7fe52df
Approved · unknown

CCCL — Vegetation, Native Salt Resist (Johanna Wigman)

4000 Ocean Beach Blvd, Cocoa Beach

Load estimate pending
Lifecycle
Permitted as of Apr 19, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Vegetation, Native Salt Resist (Johanna Wigman)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8033819 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Rock Solid Rock, LLC · Titusville
One-way
15.3 mi
Round trip
30.6 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryRock Solid Rock, LLCTitusville15.3 mi30.6~75m$175–$230
quarryBuck HammockOrlando 25.4 mi50.9~100m$230–$290
quarryBeeline MineOrlando26.0 mi52~100m$230–$290
quarryS & L Materials IncKISSIMMEE26.5 mi53~100m$230–$290
quarryBrisbane PitFellsmere35.1 mi70.2~100m$230–$290
sand pitSunshine MineFort Pierce36.0 mi72~100m$230–$290
sand pitVero Rock and SandVero Beach44.6 mi89.2~130m$290–$370
sand pitBlue Goose MineFort Pierce45.3 mi90.7~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80338192026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/d7fe52df