Leads/d7c1ae8b
Approved · unknownBrevard County

FDOT — SR A1A SIDEWALK FROM SR 518 TO VOLUNTEER WAY - SIDEWALK

Brevard County — FDOT Contract T5829

Load estimate pending
Lifecycle
Completed as of Mar 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR A1A SIDEWALK FROM SR 518 TO VOLUNTEER WAY - SIDEWALK

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$2.1M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR A1A SIDEWALK FROM SR 518 TO VOLUNTEER WAY - SIDEWALK. Vendor: ALEXANDER DESIGN + BUILD, LLC. Cost: $2,084,286. | FDOT public project (+15) | size signal: $2,084,286 valuation (+12) | FDOT public project (+15) | size signal: $2,084,286 valuation (+12) | FDOT public project (+15) | size signal: $2,084,286 valuation (+12) | FDOT public project (+15) | size signal: $2,084,286 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T5829_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Buck Hammock · Orlando
One-way
19.5 mi
Round trip
39.1 mi
TypeNameCityOne-wayRT mi
quarryBuck HammockOrlando 19.5 mi39.1
quarryBrisbane PitFellsmere21.4 mi42.7
sand pitSunshine MineFort Pierce22.2 mi44.4
quarryRock Solid Rock, LLCTitusville26.0 mi52
sand pitVero Rock and SandVero Beach30.7 mi61.4
sand pitBlue Goose MineFort Pierce31.5 mi62.9
quarryS & L Materials IncKISSIMMEE34.2 mi68.4
quarryBeeline MineOrlando34.9 mi69.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Brevard County Permits
Melbourne / Titusville Building Dept
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T5829_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Brevard
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d7c1ae8b