Leads/d533cc7b
Approved · unknownPINELLAS County

USACE 404 — TURTLE BEACH

0 SEAVIEW DRIVE, CRYSTAL BEACH, FL, 34681

Load estimate pending
Lifecycle
Permitted as of Jun 21, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — TURTLE BEACH

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | demolition keywords (+15) | stage=permit_issued, but stale (10y old) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0334712-002-EI from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
23.0 mi
Round trip
46 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa23.0 mi46~75m$175–$230
sand pitCounty Line MineSpring Hill27.2 mi54.4~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 27.3 mi54.6~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill30.6 mi61.3~100m$230–$290
quarryCaloosa MaterialsRuskin33.6 mi67.1~100m$230–$290
quarryBrooksville QuarryBrooksville40.1 mi80.1~130m$290–$370
quarryBrooksville South Cement PlantBrooksville40.8 mi81.6~130m$290–$370
quarryCalcium PlantJacksonville43.7 mi87.3~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0334712-002-EI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/d533cc7b