Leads/d4cc2b50
Approved · unknownAlachua County

FDOT — SR26(NEWBERRY RD) FROM WEST OF CR241 SOUTH TO WEST OF I-75(S R93) - RESURFACING

Alachua County — FDOT Contract T2A07

Load estimate pending
Lifecycle
Active as of Jun 11, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — SR26(NEWBERRY RD) FROM WEST OF CR241 SOUTH TO WEST OF I-75(S R93) - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$11.5M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR26(NEWBERRY RD) FROM WEST OF CR241 SOUTH TO WEST OF I-75(S R93) - RESURFACING. Vendor: PREFERRED MATERIALS INC.. Cost: $11,498,947. | FDOT public project (+15) | size signal: $11,498,947 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $11,498,947 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $11,498,947 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $11,498,947 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T2A07_3 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
NEWBERRY LIMESTONE · Ocala
One-way
5.1 mi
Round trip
10.2 mi
TypeNameCityOne-wayRT mi
quarryNEWBERRY LIMESTONEOcala5.1 mi10.2
quarryNEWBERRY MINE- LIMESTONE MATERIALSOcala6.1 mi12.3
quarryLIMESTONE PRODUCTS INCORPORATEDNEWBERRY6.6 mi13.2
quarryNewberry Cement PlantNewberry8.1 mi16.2
quarryRALEIGH QUARRYWILLISTON16.5 mi33.1
quarryLevy County PitBronson17.8 mi35.6
quarryOcala QuarryAtlanta 23.6 mi47.2
quarryReddick MinePompano Beach26.5 mi53.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Alachua County Permits
Gainesville area Building Permits
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T2A07_32026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Alachua
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d4cc2b50