Approved · unknownPINELLAS County
Cleanup (petroleum cleanup) — HESS #09449
6585 126TH AVE, LARGO, FL, 34643
Load estimate pending
Lifecycle
Permitted as of Jul 3, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — HESS #09449
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation status. Environmental data point, not an active construction lead; kept for enrichment/adjacency context only.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-04FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88167844 from fdep_cleanup_sites
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
CLEARWATER MATERIALS TRANSFER FACILITY · Clearwater
One-way
0.8 mi
Round trip
1.6 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
17.8 mi
Round trip
35.7 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 17.8 mi | 35.7 |
| quarry | Caloosa Materials | Ruskin | 21.8 mi | 43.5 |
| quarry | Central State Aggregates LLC | Zephyrhill | 34.3 mi | 68.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 37.5 mi | 74.9 |
| sand pit | County Line Mine | Spring Hill | 38.9 mi | 77.8 |
| quarry | Wingate Creek Mine | Lithia | 45.7 mi | 91.4 |
| quarry | Four Corners | Lithia | 47.1 mi | 94.2 |
| transfer station | CLEARWATER MATERIALS TRANSFER FACILITY | Clearwater | 0.8 mi | 1.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_88167844 | 2026-07-04 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/d16afa5f