Leads/d0d296e4
Approved · unknownSARASOTA County

USACE 404 — 6198 E HILLSBOROUGH BLVD [DOCK]

6198 E HILLSBOROUGH BLVD, NORTH PORT, FL, 34288

Load estimate pending
Lifecycle
Permitted as of Dec 21, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 6198 E HILLSBOROUGH BLVD [DOCK]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (9y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0349924-001-EE from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
10.4 mi
Round trip
20.8 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitWashington Loop MinePunta Gorda10.4 mi20.8~55m$140–$175
quarryBermont Materials AlicoPunta Gorda12.1 mi24.1~55m$140–$175
quarryFlorida Shell & Fill Company LLCNaples16.6 mi33.1~75m$175–$230
quarry4M-31 MineAlva19.0 mi37.9~75m$175–$230
quarryHalls MineNaples20.8 mi41.6~75m$175–$230
sand pitWatermelon PitPunta Gorda21.1 mi42.1~75m$175–$230
quarryHighlands County Shell PitSebring21.7 mi43.5~75m$175–$230
quarryWright Farms PitNocatee21.7 mi43.5~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0349924-001-EE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
SARASOTA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/d0d296e4