Leads/construction-project-b-38-sulphur-springs-hillsborough-fl-0cad4d13
Approved · unknownHillsborough County

NOC – Curtel Morris-Dozier | 8209 N Brooks Street

8209 N Brooks Street

~4loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Jan 10, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Curtel Morris-Dozier | 8209 N Brooks Street

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.027 ac
Parcel 1466160000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Curtel Morris-Dozier
Developer / Applicant
MORRIS DOZIER CURTEL
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Reroof from hurricane damage | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025012917 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_1466160000_13572ef4 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
6.0 mi
Round trip
12 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa6.0 mi12
quarryCentral State Aggregates LLCZephyrhill15.5 mi30.9
quarryCaloosa MaterialsRuskin22.1 mi44.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 25.2 mi50.5
sand pitCounty Line MineSpring Hill29.3 mi58.6
quarryFour CornersLithia34.0 mi68.1
quarryWest Florida AggregateWebster38.4 mi76.8
quarryBrooksville QuarryBrooksville38.7 mi77.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MORRIS DOZIER CURTEL
Contractor
Curtel Morris-Dozier
1 active project · Hillsborough
~4 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20250129172026-05-22Open ↗
hcpaHCPA_1466160000_13572ef42026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1466160000
Strap
A-30-28-19-45M-000038-00005.0
Address
8209 N BROOKS ST, TAMPA
Zip
33604
Acreage
0.027 ac
Sq ft
1,197
Homestead
YES
Owner of record
MORRIS CURTEL E
Last sale
1987-07-01
$100(transfer)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/construction-project-b-38-sulphur-springs-hillsborough-fl-0cad4d13