Complete demolition and removal of single family home, swimming pool, and sewer — 214 S Occident St Tampa FL
214 S Occident St Tampa FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-02OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026206785 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 5.1 mi | 10.3 |
| quarry | Caloosa Materials | Ruskin | 17.3 mi | 34.6 |
| quarry | Central State Aggregates LLC | Zephyrhill | 22.9 mi | 45.9 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 30.8 mi | 61.5 |
| sand pit | County Line Mine | Spring Hill | 34.0 mi | 68 |
| quarry | Four Corners | Lithia | 36.1 mi | 72.2 |
| quarry | Wingate Creek Mine | Lithia | 39.3 mi | 78.6 |
| quarry | South Pasture Mine | Lithia | 40.9 mi | 81.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026206785 | 2026-07-02 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/complete-demolition-and-removal-of-single-family-home-swimming-pool-and-sewer-21-28e9204a