Leads/ce22434c
Approved · planning

CONSTRUCTION OF A CHURCH

10331 OLD LAKELAND HWY, DADE CITY, FL, 33525

Load estimate pending
Lifecycle
Permitted as of Jul 7, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CONSTRUCTION OF A CHURCH

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CORNELISON ENGINEERING & DESIGN, INC.
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (7y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0366341-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
11.4 mi
Round trip
22.7 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCentral State Aggregates LLCZephyrhill11.4 mi22.7~55m$140–$175
quarryWest Florida AggregateWebster13.8 mi27.6~55m$140–$175
quarryGeorgia Stone Spring Hill QuarryAtlanta 21.4 mi42.8~75m$175–$230
quarryMid-Coast Aggregates LLC-Mazak MineWebster22.1 mi44.1~75m$175–$230
sand pit474 Sand MineBrooksville24.4 mi48.8~75m$175–$230
sand pitLake Sand PlantJacksonville25.5 mi51~100m$230–$290
quarryBrooksville South Cement PlantBrooksville25.6 mi51.2~100m$230–$290
quarryBrooksville QuarryBrooksville26.1 mi52.2~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CORNELISON ENGINEERING & DESIGN, INC.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0366341-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/ce22434c