CAS CONSTRUCTION LLC project — 32-24-21
32-24-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
CAS CONSTRUCTION LLC's earthwork development project at 32-24-21 has just received permits and is ready to move forward, presenting an immediate hauling opportunity with a strong 75/100 score. The site development work will likely require significant cut/fill operations, topsoil removal, and material transport—core services for earthmoving haulers. Contact Prime GC CAS CONSTRUCTION LLC at (407) 707-4213 or reach out to owner Julian Eliseo Enrique to position for soil, debris, and aggregate haul contracts before mobilization begins.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026037805 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 11.1 mi | 22.1 |
| quarry | West Florida Aggregate | Webster | 12.1 mi | 24.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 16.0 mi | 32.1 |
| quarry | Brooksville South Cement Plant | Brooksville | 20.1 mi | 40.2 |
| quarry | Brooksville Quarry | Brooksville | 20.5 mi | 41.1 |
| sand pit | County Line Mine | Spring Hill | 21.4 mi | 42.9 |
| quarry | Center Hill Mine | Brooksville | 21.5 mi | 42.9 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 22.2 mi | 44.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026037805 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/cas-construction-llc-project-32-24-21-pasco-fl-b8b14ac0