Leads/carrabba-s-italian-grill-orange-fl-7e1620c9
Approved · unknownOrange County

CARRABBA'S ITALIAN GRILL

8702 VINELAND AVE, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

CARRABBA'S ITALIAN GRILL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CARRABBA'S ITALIAN GRILL
Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10DH21 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Cypress Sand · Lexington
One-way
11.4 mi
Round trip
22.8 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCypress SandLexington11.4 mi22.8~55m$140–$175
sand pitHilochee Sand MineDavenport12.1 mi24.3~55m$140–$175
sand pitFour Corners Sand MineBrooksville12.3 mi24.6~55m$140–$175
quarryFLINT PLANTDavenport13.7 mi27.3~55m$140–$175
sand pitGator Sand MineBrooksville13.9 mi27.7~55m$140–$175
sand pitGreen Bay MineDavenport13.9 mi27.8~55m$140–$175
sand pitCenter Sand CompanyClermont14.2 mi28.3~55m$140–$175
sand pitDavenport Sand MineBrooksville14.2 mi28.4~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CARRABBA'S ITALIAN GRILL

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10DH212026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/carrabba-s-italian-grill-orange-fl-7e1620c9