Leads/caldevillea-richard-s-project-3410-henderson-blvd-ste-200-tpa-hillsborough-fl-55697e97
Approved · unknownHillsborough County

NOC – South Henderson LLC | Richard S Caldevilla DBA Caldeco Mechanical Services Inc. | 3410 Henderson Blvd.

3410 Henderson Blvd., Suite 200, Tampa, FL 33609

~17loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Aug 6, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – South Henderson LLC | Richard S Caldevilla DBA Caldeco Mechanical Services Inc. | 3410 Henderson Blvd.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.124 ac
Parcel 1166380000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
CALDEVILLEA RICHARD S
📞 (813) 254-2211
Developer / Applicant
SOUTH HENDERSON LLC
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; HVAC EQUAL CHANGEOUT | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025341412 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_1166380000_6b0a8196 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.5 mi
Round trip
7.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa3.5 mi7.1
quarryCaloosa MaterialsRuskin16.7 mi33.4
quarryCentral State Aggregates LLCZephyrhill22.1 mi44.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.9 mi61.8
sand pitCounty Line MineSpring Hill34.3 mi68.7
quarryFour CornersLithia34.5 mi69
quarryWingate Creek MineLithia38.1 mi76.3
quarrySouth Pasture MineLithia39.4 mi78.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SOUTH HENDERSON LLC
Contractor
CALDEVILLEA RICHARD S
1 active project · Hillsborough
~17 est. loads · fill dirt
📞 (813) 254-2211

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20253414122026-05-21Open ↗
hcpaHCPA_1166380000_6b0a81962026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1166380000
Strap
A-22-29-18-3N8-000000-00001.0
Address
3410 HENDERSON BLVD, TAMPA
Zip
33609
Acreage
0.124 ac
Sq ft
5,398
Homestead
NO
Owner of record
SOUTH HENDERSON LLC
Last sale
2009-12-22
$2,265,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/caldevillea-richard-s-project-3410-henderson-blvd-ste-200-tpa-hillsborough-fl-55697e97