Leads/c884f52d
Approved · unknown

CCCL — Temporary Facilities for One-t (Kenneth J. Bienkowski)

3400 Gulf Blvd, St. Petersburg Beach

Load estimate pending
Lifecycle
Permitted as of Oct 9, 2002
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Temporary Facilities for One-t (Kenneth J. Bienkowski)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (23y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8015415 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
A & S OIL RECOVERY OF FLORIDA INC · St Petersburg
One-way
4.5 mi
Round trip
8.9 mi · ~25 min
Rate / load
$85–$110
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
18.3 mi
Round trip
36.6 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin18.3 mi36.6~75m$175–$230
quarryTampa Cement Grinding PlantTampa23.9 mi47.8~75m$175–$230
quarryWingate Creek MineLithia40.4 mi80.7~130m$290–$370
quarryCentral State Aggregates LLCZephyrhill43.6 mi87.1~130m$290–$370
quarryFour CornersLithia47.1 mi94.2~130m$290–$370
quarrySouth Pasture MineLithia48.6 mi97.2~130m$290–$370
quarryGeorgia Stone Spring Hill QuarryAtlanta 49.1 mi98.3~130m$290–$370
transfer stationA & S OIL RECOVERY OF FLORIDA INCSt Petersburg4.5 mi8.9~25m$85–$110
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80154152026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/c884f52d