Leads/c7a51930
Approved · unknown

CCCL — Temporary Facilities for One-t (Robert Ondo)

Bradenton Beach

Load estimate pending
Lifecycle
Permitted as of Aug 17, 2004
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Temporary Facilities for One-t (Robert Ondo)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (21y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8017503 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
9.3 mi
Round trip
18.6 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
23.3 mi
Round trip
46.5 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin23.3 mi46.5~75m$175–$230
quarryWingate Creek MineLithia35.0 mi70.1~100m$230–$290
quarryTampa Cement Grinding PlantTampa36.8 mi73.6~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples40.9 mi81.8~130m$290–$370
quarrySouth Pasture MineLithia47.6 mi95.1~130m$290–$370
quarryFour CornersLithia49.2 mi98.3~130m$290–$370
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton9.3 mi18.6~40m$110–$140
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota11.2 mi22.4~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80175032026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars