Leads/c6971059
Approved · unknownPINELLAS County

USACE 404 — LARSEN RIP RAP

1821 N HIGHLAND AVE, TARPON SPRINGS, FL, 34688

Load estimate pending
Lifecycle
Permitted as of Apr 2, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — LARSEN RIP RAP

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | single-trade residential permit — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0441970-001-EI from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
21.2 mi
Round trip
42.4 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill21.2 mi42.4~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 21.3 mi42.6~75m$175–$230
quarryTampa Cement Grinding PlantTampa23.1 mi46.2~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill26.4 mi52.8~100m$230–$290
quarryBrooksville QuarryBrooksville34.0 mi68~100m$230–$290
quarryBrooksville South Cement PlantBrooksville34.7 mi69.5~100m$230–$290
quarryCaloosa MaterialsRuskin35.9 mi71.9~100m$230–$290
quarryCalcium PlantJacksonville37.6 mi75.2~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0441970-001-EI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/c6971059