Leads/c6963a19
Approved · planning

CONSTRUCT 3 RETAIL STORES

1217 US HIGHWAY 19, HOLIDAY, FL, 34691

Load estimate pending
Lifecycle
Permitted as of Aug 12, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CONSTRUCT 3 RETAIL STORES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
NORTHSIDE ENGINEERING, INC.
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0463615-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
20.6 mi
Round trip
41.2 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill20.6 mi41.2~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 21.1 mi42.3~75m$175–$230
quarryTampa Cement Grinding PlantTampa24.7 mi49.3~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill27.2 mi54.5~100m$230–$290
quarryBrooksville QuarryBrooksville33.5 mi67~100m$230–$290
quarryBrooksville South Cement PlantBrooksville34.2 mi68.5~100m$230–$290
quarryCalcium PlantJacksonville37.0 mi74.1~100m$230–$290
quarryCaloosa MaterialsRuskin37.5 mi75~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
NORTHSIDE ENGINEERING, INC.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0463615-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/c6963a19