Approved · unknownLake County
FDOT — SR 40 / ASTOR BRIDGE # 110077 ELECTR/MECH REHAB - BRIDGE-REP AIR/REHABILITATION
Lake County — FDOT Contract E52F0
Load estimate pending
Lifecycle
Active as of Jan 5, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 40 / ASTOR BRIDGE # 110077 ELECTR/MECH REHAB - BRIDGE-REP AIR/REHABILITATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$5.6M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 40 / ASTOR BRIDGE # 110077 ELECTR/MECH REHAB - BRIDGE-REP AIR/REHABILITATION. Vendor: SEACOAST INCORPORATED. Cost: $5,584,898. | FDOT public project (+15) | size signal: $5,584,898 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $5,584,898 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $5,584,898 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E52F0_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Lynne Mine · Davenport
One-way
23.0 mi
Round trip
46 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Lynne Mine | Davenport | 23.0 mi | 46 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 24.2 mi | 48.3 |
| sand pit | Lisbon Sand | Lexington | 25.1 mi | 50.3 |
| sand pit | Astatula Sand Plant | Jacksonville | 34.5 mi | 69 |
| quarry | NORTH MINE | OCALA | 34.7 mi | 69.4 |
| quarry | SRM Materials East Palatka | Murfresboro | 35.6 mi | 71.3 |
| sand pit | Okahumpka | Leesburg | 37.0 mi | 74 |
| quarry | Edgar Minerals, Inc. | Davenport | 38.6 mi | 77.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E52F0_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Lake
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/c618854b