Leads/c5b8e3d5
Approved · application_filed

TPS WEST DOCK REHABILITATION

3421 PORT SUTTON RD, TAMPA, FL, 33619

Load estimate pending
Lifecycle
Filed as of Jan 15, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

TPS WEST DOCK REHABILITATION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
TAMPA PORT SERVICES, LLC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0244153-003 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.4 mi
Round trip
4.9 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa2.4 mi4.9~25m$85–$110
quarryCaloosa MaterialsRuskin13.9 mi27.9~55m$140–$175
quarryCentral State Aggregates LLCZephyrhill22.1 mi44.2~75m$175–$230
quarryFour CornersLithia29.4 mi58.7~100m$230–$290
quarryWingate Creek MineLithia33.5 mi67~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 33.5 mi67~100m$230–$290
quarrySouth Pasture MineLithia34.2 mi68.3~100m$230–$290
sand pitCounty Line MineSpring Hill37.5 mi75~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
TAMPA PORT SERVICES, LLC

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0244153-0032026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/c5b8e3d5