Approved · unknown
Ready Mix Concrete Plant — THALLE - T/TPR38 CBP
12505 US 27, SOUTH BAY, FL, 33493
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — THALLE - T/TPR38 CBP
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Unpermitted ready mix concrete plant — pre-construction signal. | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_7776560 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Star Quarries · SOUTH BAY
One-way
1.3 mi
Round trip
2.7 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Star Quarries | SOUTH BAY | 1.3 mi | 2.7 |
| quarry | Ridgdill & Son | CLEWISTON | 14.6 mi | 29.2 |
| sand pit | Garcia 833 Mine | Virginia Beach | 17.3 mi | 34.7 |
| quarry | Five Stones Mine, LLC. | Tinton Falls | 20.9 mi | 41.8 |
| quarry | Palm Beach Aggregates LLC | Jacksonville | 22.0 mi | 43.9 |
| quarry | Big Cypress Rock Mine | Clewiston | 25.4 mi | 50.9 |
| sand pit | Boar Hammock Sand Mine | Jupiter | 28.9 mi | 57.8 |
| quarry | PJM Rock Mine & Aggregates, LLC | CLEWISTON | 30.1 mi | 60.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_7776560 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/c3a731e0