Leads/c3796bc6
Approved · application_filed

COSME EOC - PACKAGE 1

16015 RACE TRACK RD, ODESSA, FL, 33556

Load estimate pending
Lifecycle
Filed as of May 15, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

COSME EOC - PACKAGE 1

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CITY OF ST PETERSBURG
Why this is a hauling opportunity: Base unknown/other (20) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0366329-003 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
14.5 mi
Round trip
29.1 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa14.5 mi29.1~55m$140–$175
quarryCentral State Aggregates LLCZephyrhill19.8 mi39.6~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 21.0 mi42.1~75m$175–$230
sand pitCounty Line MineSpring Hill23.2 mi46.5~75m$175–$230
quarryCaloosa MaterialsRuskin28.8 mi57.6~100m$230–$290
quarryBrooksville QuarryBrooksville34.9 mi69.8~100m$230–$290
quarryBrooksville South Cement PlantBrooksville35.4 mi70.8~100m$230–$290
quarryCalcium PlantJacksonville38.6 mi77.2~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CITY OF ST PETERSBURG

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0366329-0032026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/c3796bc6