Leads/c28c7258
Approved · unknownPINELLAS County

USACE 404 — BOCA CIEGA RESTORATION AREA

SEE DIRECTIONS, SAINT PETERSBURG, FL, 33711

Load estimate pending
Lifecycle
Permitted as of Mar 10, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — BOCA CIEGA RESTORATION AREA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/10/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0469218-001-EG from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.6 mi
Round trip
31.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin15.6 mi31.3
quarryTampa Cement Grinding PlantTampa20.6 mi41.2
quarryWingate Creek MineLithia38.5 mi77
quarryCentral State Aggregates LLCZephyrhill40.4 mi80.8
quarryFour CornersLithia44.2 mi88.3
quarrySouth Pasture MineLithia46.0 mi92
quarryGeorgia Stone Spring Hill QuarryAtlanta 46.6 mi93.1
sand pitCounty Line MineSpring Hill48.7 mi97.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0469218-001-EG2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c28c7258