Leads/c19e33d2
Approved · application_filedSarasota County

Unity Community Center

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Unity Community Center

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$562K
Actual — from source record
Acreage
Parcel 1152480060
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
John Krueger
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $562,000 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_941295 from swfwmd_erp
  2. 2026-06-23FL_DOR_CADASTRAL
    Captured FDOR_1152480060_c19e33d2 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
8.7 mi
Round trip
17.4 mi
TypeNameCityOne-wayRT mi
sand pitWashington Loop MinePunta Gorda8.7 mi17.4
quarryBermont Materials AlicoPunta Gorda10.4 mi20.8
quarry4M-31 MineAlva17.5 mi34.9
quarryFlorida Shell & Fill Company LLCNaples18.4 mi36.9
quarryHalls MineNaples18.9 mi37.8
sand pitWatermelon PitPunta Gorda19.1 mi38.1
quarryHighlands County Shell PitSebring19.8 mi39.5
quarryWright Farms PitNocatee19.8 mi39.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
John Krueger

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9412952026-05-17Open ↗
fl_dor_cadastralFDOR_1152480060_c19e33d22026-06-23Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
1152480060
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c19e33d2