Leads/brown-rhonda-project-304-10th-st-sw-hillsborough-fl-09287254
Approved · unknownHillsborough County

NOC – Rhonda Brown | Owner / Builder | 304 107th St SW

304 107th St SW, Ruskin, FL 33570

Load estimate pending
Lifecycle
Permitted as of Sep 5, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Rhonda Brown | Owner / Builder | 304 107th St SW

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor
BROWN RHONDA
Developer / Applicant
BROWN RHONDA
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Add Garage - Remove Carport | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025386691 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
1.3 mi
Round trip
2.6 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin1.3 mi2.6~25m$85–$110
quarryTampa Cement Grinding PlantTampa14.8 mi29.7~55m$140–$175
quarryWingate Creek MineLithia24.4 mi48.9~75m$175–$230
quarryFour CornersLithia28.5 mi57~100m$230–$290
quarrySouth Pasture MineLithia30.2 mi60.4~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill34.4 mi68.8~100m$230–$290
quarrySouth Fort Meade MineLithia41.8 mi83.7~130m$290–$370
quarryGeorgia Stone Spring Hill QuarryAtlanta 46.0 mi92.1~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
BROWN RHONDA
1 active project · Hillsborough
Contractor
BROWN RHONDA
1 active project · Hillsborough

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20253866912026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/brown-rhonda-project-304-10th-st-sw-hillsborough-fl-09287254