NOC – Gifford Lance E | Boutros Construction LLC | 10413 Midway St
10413 Midway St, Gibsonton, FL 33534-5004
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Boutros Construction LLC is undertaking earthwork and site development at 10413 Midway St in Gibsonton, FL with permits recently issued, presenting a strong hauling opportunity (75/100 score) for material movement and site prep work. The NOC filing and project stage indicate active execution is imminent, making this an ideal time for hauling providers to engage with either Boutros Construction or owner Gifford Lance E to secure contracts for excavation debris, fill material, or general site logistics. Early outreach to the GC is recommended to establish relationships before material flows begin.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026152122 from official_records_noc
- 2026-05-22HCPACaptured HCPA_0502930000_8cb83886 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 8.0 mi | 16 |
| quarry | Caloosa Materials | Ruskin | 11.1 mi | 22.3 |
| quarry | Four Corners | Lithia | 24.3 mi | 48.7 |
| quarry | Central State Aggregates LLC | Zephyrhill | 24.9 mi | 49.9 |
| quarry | Wingate Creek Mine | Lithia | 28.0 mi | 56 |
| quarry | South Pasture Mine | Lithia | 28.7 mi | 57.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 38.1 mi | 76.2 |
| quarry | South Fort Meade Mine | Lithia | 39.3 mi | 78.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026152122 | 2026-05-21 | Open ↗ |
| hcpa | HCPA_0502930000_8cb83886 | 2026-05-22 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 0502930000
- Strap
- U-25-30-19-1RO-000002-00045.0
- Address
- 10413 MIDWAY ST, GIBSONTON
- Zip
- 33534
- Acreage
- 0.036 ac
- Sq ft
- 1,551
- Homestead
- YES
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/boutros-construction-llc-project-varns-resubd-l-45-l-46-pt-l-47-b-2-hillsborough-92974073