BOUTROS CONSTRUCTION LLC project — 19-26-17
19-26-17
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Boutros Construction LLC is mobilizing earthwork operations for a site development project in 19-26-17 with permits now issued—this is a prime hauling opportunity at the actionable stage. The project requires excavation and material movement typical of site prep work, creating immediate demand for dirt, spoils, and fill hauling services. Key contacts are owner Urrutia Lissette and GC Boutros Construction LLC, making this a solid prospect for outreach on equipment and disposal solutions.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026081242 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 15.4 mi | 30.7 |
| sand pit | County Line Mine | Spring Hill | 16.1 mi | 32.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.1 mi | 42.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 22.4 mi | 44.9 |
| quarry | Brooksville Quarry | Brooksville | 28.6 mi | 57.1 |
| quarry | Brooksville South Cement Plant | Brooksville | 29.2 mi | 58.4 |
| quarry | Calcium Plant | Jacksonville | 32.2 mi | 64.4 |
| quarry | Center Hill Mine | Brooksville | 35.4 mi | 70.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026081242 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/boutros-construction-llc-project-19-26-17-pasco-fl-a0510b3c