Leads/blevins-howard-r-project-8303-sandstone-ct-tampa-hillsborough-fl-0d756a3b
Approved · unknownHillsborough County

NOC – Camorie Nolann | Howton R. Blevins | 8303 Sandstone Ct.

8303 Sandstone Ct., Tampa, FL 33615

~4loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Apr 17, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Camorie Nolann | Howton R. Blevins | 8303 Sandstone Ct.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.027 ac
Parcel 0110390000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
BLEVINS HOWARD R
📞 (813) 789-1135
Developer / Applicant
NOLAND CAMERIE
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Replace 12 Windows - Size for Size - with 12 Impact Rated Simonton Windows. Total Cost $19,600.00 | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026150384 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_0110390000_3a614edd from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
8.8 mi
Round trip
17.6 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa8.8 mi17.6
quarryCaloosa MaterialsRuskin21.3 mi42.5
quarryCentral State Aggregates LLCZephyrhill22.6 mi45.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.0 mi56.1
sand pitCounty Line MineSpring Hill30.8 mi61.5
quarryFour CornersLithia39.9 mi79.9
quarryBrooksville QuarryBrooksville41.9 mi83.9
quarryBrooksville South Cement PlantBrooksville42.4 mi84.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
NOLAND CAMERIE
Contractor
BLEVINS HOWARD R
1 active project · Hillsborough
~4 est. loads · fill dirt
📞 (813) 789-1135

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20261503842026-05-21Open ↗
hcpaHCPA_0110390000_3a614edd2026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0110390000
Strap
U-02-29-17-0F4-000001-00026.0
Address
8303 SANDSTONE CT, TAMPA
Zip
33615
Acreage
0.027 ac
Sq ft
1,192
Homestead
YES
Owner of record
MIRES CAMERIE A
NOLAND JOSHUA S
Last sale
2018-11-01
$260,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/blevins-howard-r-project-8303-sandstone-ct-tampa-hillsborough-fl-0d756a3b