Leads/beccd8ed
Approved · application_filed

FPL TORTUGA SUBSTATION

SR-72 BTW CLARK RD & SADDLE OAK TRAIL 0.25 MILES SE I/O SR-72 & SADDLE OAK TRL, SARASOTA, FL, 34241

Load estimate pending
Lifecycle
Filed as of Feb 18, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

FPL TORTUGA SUBSTATION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/18/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
FLORIDA POWER & LIGHT
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0468827-002 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
21.0 mi
Round trip
41.9 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples21.0 mi41.9
quarryWingate Creek MineLithia23.2 mi46.3
quarry4M-31 MineAlva31.5 mi63
quarryCaloosa MaterialsRuskin31.8 mi63.6
sand pitWashington Loop MinePunta Gorda32.4 mi64.8
quarryBermont Materials AlicoPunta Gorda34.1 mi68.3
quarrySouth Pasture MineLithia37.9 mi75.8
sand pitWatermelon PitPunta Gorda41.0 mi82
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FLORIDA POWER & LIGHT

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0468827-0022026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/beccd8ed