Leads/bd8c2475
Approved · unknown

CCCL — Single Family Dwelling (Brad H. & Susan N. Boyer)

718 Indian Pass Road 32456

Load estimate pending
Lifecycle
Permitted as of Jan 26, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Single Family Dwelling (Brad H. & Susan N. Boyer)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (5y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_GU000832 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
FIVE POINTS CLASS III LANDFILL · Port St Joe
One-way
10.0 mi
Round trip
20.1 mi · ~55 min
Rate / load
$140–$175
Closest import source (quarry)
Honeyville Pit
One-way
25.9 mi
Round trip
51.8 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
landfillFIVE POINTS CLASS III LANDFILLPort St Joe10.0 mi20.1~55m$140–$175
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe10.9 mi21.7~55m$140–$175
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint26.4 mi52.9~100m$230–$290
landfillTRASH ROLLOFF OF BAY COUNTY INC. PITYoungstown45.7 mi91.4~130m$290–$370
landfill(unnamed)10.1 mi20.2~55m$140–$175
landfill(unnamed)10.9 mi21.7~55m$140–$175
landfill(unnamed)14.7 mi29.4~55m$140–$175
quarryHoneyville Pit25.9 mi51.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_GU0008322026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/bd8c2475