NOC – MJA Land Developments, L.L.C | Bandes Construction | 946 Cypress Village Boulevard
946 Cypress Village Boulevard, Suite B, Ruskin, Florida 3373
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
MJA Land Developments' commercial site development at 946 Cypress Village Boulevard in Ruskin, Florida is a permitted earthwork project with strong hauling demand, evidenced by its 75/100 opportunity score and NOC filing confirmation. Bandes Construction will need substantial material hauling for site prep, fill operations, and general earthwork, representing a solid window for equipment and debris removal services. Key contacts are SUN CITY NV LLC and MJA LAND DEVELOPMENT LLC (owner-developers) and Bandes Construction (prime GC).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025085146 from official_records_noc
- 2026-05-22OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025085145 from official_records_noc
- 2026-05-22HCPACaptured HCPA_0549536042_58107784 from hcpa
- 2026-05-22HCPACaptured HCPA_0549536042_8cefc2f7 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 3.8 mi | 7.7 |
| quarry | Tampa Cement Grinding Plant | Tampa | 15.1 mi | 30.2 |
| quarry | Wingate Creek Mine | Lithia | 22.2 mi | 44.3 |
| quarry | Four Corners | Lithia | 25.3 mi | 50.5 |
| quarry | South Pasture Mine | Lithia | 27.1 mi | 54.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 33.6 mi | 67.2 |
| quarry | South Fort Meade Mine | Lithia | 38.7 mi | 77.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 46.2 mi | 92.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025085146 | 2026-05-22 | Open ↗ |
| official_records_noc | Hillsborough_2025085145 | 2026-05-22 | Open ↗ |
| hcpa | HCPA_0549536042_58107784 | 2026-05-22 | Open ↗ |
| hcpa | HCPA_0549536042_8cefc2f7 | 2026-05-22 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 0549536042
- Strap
- U-02-32-19-D6Q-000000-A0000.0
- Address
- 946 CYPRESS VILLAGE BLVD, UNIT A, RUSKIN
- Zip
- 33573-
- Acreage
- 0.01 ac
- Sq ft
- 422
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/bandes-construction-project-b-946-cypress-village-blvd-condo-hillsborough-fl-34276468