Leads/babec38a
Approved · unknown

CCCL — Swimming Pool (Amgad and Nermeen Girgis)

4121 S. Ocean Blvd., Highland Beach

Load estimate pending
Lifecycle
Permitted as of Sep 23, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Swimming Pool (Amgad and Nermeen Girgis)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (11y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_PB001041 M1 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
28.6 mi
Round trip
57.1 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
quarryPalm Beach Aggregates LLCJacksonville28.6 mi57.1~100m$230–$290
quarryWHITE ROCK QUARRIESWest Palm Beach38.0 mi76~100m$230–$290
quarryFEC QUARRYMIAMI40.5 mi80.9~130m$290–$370
quarryPENNSUCO QUARRYMedley40.7 mi81.5~130m$290–$370
quarryPENNSUCO CEMENT PLANTMedley40.7 mi81.5~130m$290–$370
quarryStar QuarriesSOUTH BAY45.6 mi91.3~130m$290–$370
quarryMiami QuarryJacksonville46.2 mi92.3~130m$290–$370
quarryEpic Stoneworks, Inc.Cutler Bay46.5 mi92.9~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_PB001041 M12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/babec38a