Approved · unknownLeon County
FDOT — SR 8 (I-10) FROM W OF OLSON RD TO E OF SR 10 (US 90) MAHAN D RIVE - RESURFACING
Leon County — FDOT Contract T3935
Load estimate pending
Lifecycle
Completed as of May 29, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 8 (I-10) FROM W OF OLSON RD TO E OF SR 10 (US 90) MAHAN D RIVE - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$7.0M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 8 (I-10) FROM W OF OLSON RD TO E OF SR 10 (US 90) MAHAN D RIVE - RESURFACING. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $6,962,016. | FDOT public project (+15) | size signal: $6,962,016 valuation (+20) | FDOT public project (+15) | size signal: $6,962,016 valuation (+20) | FDOT public project (+15) | size signal: $6,962,016 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T3935_2 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
LEON COUNTY SOLID WASTE MANAGEMENT FACILITY · Tallahassee
One-way
4.6 mi
Round trip
9.2 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
16.0 mi
Round trip
32 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 16.0 mi | 32 |
| quarry | Quincy Plant and Mines | QUINCY | 25.8 mi | 51.7 |
| quarry | CYD Cabbage Grove | Daytona Beach | 26.0 mi | 52 |
| quarry | Perry Quarry | Fort Myers | 26.1 mi | 52.1 |
| quarry | Active Minerals Attapulgite Division | Quincy | 26.3 mi | 52.7 |
| sand pit | A-Mining Group II LLC. | Quincy | 29.2 mi | 58.5 |
| quarry | SRM Materials Cabbage Grove | Lamont | 42.6 mi | 85.3 |
| landfill | LEON COUNTY SOLID WASTE MANAGEMENT FACILITY | Tallahassee | 4.6 mi | 9.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T3935_2 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Leon
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/b68b4404