Approved · unknownMonroe County
FDOT — SR-5/OVERSEAS HWY OVER OHIO BAHIA HONDA CHANNEL BRIDGE 90010 5 - BRIDGE-REPAIR/REHABILITATION
Monroe County — FDOT Contract E6P26
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
FDOT — SR-5/OVERSEAS HWY OVER OHIO BAHIA HONDA CHANNEL BRIDGE 90010 5 - BRIDGE-REPAIR/REHABILITATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$1.9M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR-5/OVERSEAS HWY OVER OHIO BAHIA HONDA CHANNEL BRIDGE 90010 5 - BRIDGE-REPAIR/R. Vendor: SEACOAST INCORPORATED. Cost: $1,936,382. | FDOT public project (+15) | size signal: $1,936,382 valuation (+12) | FDOT public project (+15) | size signal: $1,936,382 valuation (+12) | FDOT public project (+15) | size signal: $1,936,382 valuation (+12) | FDOT public project (+15) | size signal: $1,936,382 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E6P26_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
MARATHON TRANSFER STATION · Marathon
One-way
13.7 mi
Round trip
27.3 mi
Closest import source (quarry)
Windley Quarry
One-way
45.3 mi
Round trip
90.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| transfer station | MARATHON TRANSFER STATION | Marathon | 13.7 mi | 27.3 |
| landfill | CUDJOE KEY LANDFILL | Cudjoe Key | 16.3 mi | 32.7 |
| transfer station | NEW ROCKLAND RECYCLING CENTER | Key West | 27.5 mi | 55 |
| transfer station | CITY OF KEY WEST SOLID WASTE TRANSFER STATION | Key West | 27.6 mi | 55.2 |
| transfer station | LONG KEY TRANSFER STATION | Long Key | 28.8 mi | 57.6 |
| transfer station | KEY WEST TRANSFER STATION AND HAULING SERVICE INC | Key West | 31.3 mi | 62.7 |
| landfill | Mount Trashmore | — | 32.0 mi | 64.1 |
| quarry | Windley Quarry | — | 45.3 mi | 90.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E6P26_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Monroe
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/b5154038