Leads/b3bb3ce5
Approved · unknownHILLSBOROUGH County

State 404 — EAST LAKE (BELLOWS LAKE)

LATITUDE 27059?26? LONGITUDE 82022?47?, TAMPA, FL, 33606

Load estimate pending
Lifecycle
Permitted as of Feb 28, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — EAST LAKE (BELLOWS LAKE)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0419938-002-SFI from fdep_state404

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.3 mi
Round trip
10.6 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa5.3 mi10.6~40m$110–$140
quarryCentral State Aggregates LLCZephyrhill15.7 mi31.3~75m$175–$230
quarryCaloosa MaterialsRuskin20.1 mi40.3~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.1 mi56.3~100m$230–$290
quarryFour CornersLithia29.5 mi59~100m$230–$290
sand pitCounty Line MineSpring Hill32.6 mi65.3~100m$230–$290
quarrySouth Pasture MineLithia35.6 mi71.2~100m$230–$290
quarryWingate Creek MineLithia37.4 mi74.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0419938-002-SFI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
HILLSBOROUGH
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/b3bb3ce5