Leads/b3847927
Approved · unknown

CCCL — Decks not attached, Gazebos, P (Terry Persaud)

1028 Estero Blvd., Ft. Myers Beach

Load estimate pending
Lifecycle
Permitted as of Nov 19, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Decks not attached, Gazebos, P (Terry Persaud)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (11y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8029734 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
ALICO ROAD QUARRY · Miami
One-way
13.0 mi
Round trip
26 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryALICO ROAD QUARRYMiami13.0 mi26~55m$140–$175
quarryFort Myers MineJacksonville15.0 mi30~55m$140–$175
quarryFort Myers QuarryFort Myers15.3 mi30.6~75m$175–$230
quarryBell MineFort Myers22.2 mi44.4~75m$175–$230
sand pitCorkscrewEstero22.5 mi45.1~75m$175–$230
sand pit846 Mine LLCNaples25.2 mi50.5~100m$230–$290
quarryJayrockPunta Gorda26.3 mi52.6~100m$230–$290
quarryGolden Gate QuarryDaytona Beach, FL26.7 mi53.5~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80297342026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/b3847927