Leads/b23e0b44
Approved · unknown

CCCL — Fill (Michael Dezer)

18325 Collins Ave., Sunny Isles Beach

Load estimate pending
Lifecycle
Permitted as of Jan 19, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Fill (Michael Dezer)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (10y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_DA000673 M1 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
FEC QUARRY · MIAMI
One-way
15.8 mi
Round trip
31.6 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFEC QUARRYMIAMI15.8 mi31.6~75m$175–$230
quarryPENNSUCO QUARRYMedley16.2 mi32.5~75m$175–$230
quarryPENNSUCO CEMENT PLANTMedley16.2 mi32.5~75m$175–$230
quarryWHITE ROCK QUARRIESWest Palm Beach17.4 mi34.7~75m$175–$230
quarryEpic Stoneworks, Inc.Cutler Bay17.5 mi35~75m$175–$230
quarryMiami QuarryJacksonville19.5 mi39.1~75m$175–$230
quarryMiami Cement PlantMiami21.8 mi43.5~75m$175–$230
quarryKrome QuarryMIAMI28.9 mi57.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_DA000673 M12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…