Leads/b147bb29
Approved · unknownPASCO County

USACE 404 — SEMINOLE ELECTRIC-EMCC BACKUP FACILITY

14425 SOFTWIND LN, SPRING HILL, FL, 34610

~10.6kloads
fill dirt + base rock
~16 mo
Lifecycle
Permitted as of Mar 1, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — SEMINOLE ELECTRIC-EMCC BACKUP FACILITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
42.42 ac
Parcel 25-24-17-0000-00100-0010
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
SEMINOLE ELECTRIC COOPERATIVE INC
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: 42 ac disturbed, ~10605 est. loads (+25) | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0360052-001-EI from fdep_spgp
  2. 2026-06-03PASCOPA
    Captured PASCOPA_25-24-17-0000-00100-0010_b147bb29 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
4.2 mi
Round trip
8.3 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryGeorgia Stone Spring Hill QuarryAtlanta 4.2 mi8.3~25m$85–$110
sand pitCounty Line MineSpring Hill4.8 mi9.6~25m$85–$110
quarryBrooksville QuarryBrooksville16.5 mi33.1~75m$175–$230
quarryBrooksville South Cement PlantBrooksville17.2 mi34.4~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill19.2 mi38.4~75m$175–$230
quarryCalcium PlantJacksonville20.2 mi40.4~75m$175–$230
quarryCenter Hill MineBrooksville23.4 mi46.9~75m$175–$230
quarryWest Florida AggregateWebster27.3 mi54.7~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
SEMINOLE ELECTRIC COOPERATIVE INC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0360052-001-EI2026-05-28Open ↗
pascopaPASCOPA_25-24-17-0000-00100-0010_b147bb292026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
25-24-17-0000-00100-0010
Strap
25-24-17-0000-00100-0010
Address
14425 SOFTWIND LANE, SPRING HILL
Zip
34610
Acreage
42.42 ac
Sq ft
1,847,815
Owner of record
SEMINOLE ELECTRIC COOPERATIVE INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$1,186,975

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/b147bb29