Leads/b0768e7a
Approved · unknown

FDOT — SOUTHERN SERVICE PLAZAS TIRE CHECK IMPROVEMENTS - REST AREA

FL County — FDOT Contract E8V52

Load estimate pending
Lifecycle
Active as of Nov 18, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — SOUTHERN SERVICE PLAZAS TIRE CHECK IMPROVEMENTS - REST AREA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$2.2M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SOUTHERN SERVICE PLAZAS TIRE CHECK IMPROVEMENTS - REST AREA. Vendor: FLORIDA ENGINEERING & DEVELOPMENT CORP. Cost: $2,195,989. | FDOT public project (+15) | size signal: $2,195,989 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $2,195,989 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $2,195,989 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $2,195,989 valuation (+12) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E8V52_2 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Krome Quarry · MIAMI
One-way
5.9 mi
Round trip
11.9 mi
TypeNameCityOne-wayRT mi
quarryKrome QuarryMIAMI5.9 mi11.9
quarryEpic Stoneworks, Inc.Cutler Bay8.4 mi16.7
quarryMiami Cement PlantMiami8.8 mi17.6
quarryMiami QuarryJacksonville9.3 mi18.6
quarryPENNSUCO QUARRYMedley14.8 mi29.7
quarryPENNSUCO CEMENT PLANTMedley14.8 mi29.7
quarryFEC QUARRYMIAMI15.0 mi29.9
quarrySDI Aggregates LLCFort Myers17.1 mi34.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E8V52_22026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/b0768e7a