Leads/athena-construction-services-project-08-26-16-pasco-fl-8d1aca0c
Approved · unknownPasco County

ATHENA CONSTRUCTION SERVICES project — 08-26-16

08-26-16

Load estimate pending
Lifecycle
Permitted as of Mar 5, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ATHENA CONSTRUCTION SERVICES project — 08-26-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
ATHENA CONSTRUCTION SERVICES
📞 (453) 486-4378
Developer / Applicant
UNITED CHRISTIAN ASSEMBLIES INC
The story

Athena Construction Services is managing an earthwork site development project for United Christian Assemblies Inc that is currently at permit-issued stage, making it immediately actionable for hauling providers. The project involves significant excavation and material movement typical of site prep work, with a strong hauling opportunity score of 75/100. Key contact is Athena Construction Services (GC) at 4534864378 to discuss earthwork removal, fill material delivery, and site logistics needs.

Why this is a hauling opportunity: General contractor NOC: ATHENA CONSTRUCTION SERVICES | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026041699 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
16.4 mi
Round trip
32.8 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill16.4 mi32.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.6 mi35.2
quarryCentral State Aggregates LLCZephyrhill26.2 mi52.4
quarryTampa Cement Grinding PlantTampa27.0 mi54.1
quarryBrooksville QuarryBrooksville29.4 mi58.7
quarryBrooksville South Cement PlantBrooksville30.1 mi60.3
quarryCalcium PlantJacksonville32.9 mi65.7
quarryCenter Hill MineBrooksville36.7 mi73.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
UNITED CHRISTIAN ASSEMBLIES INC
Contractor
ATHENA CONSTRUCTION SERVICES
1 active project · Pasco
📞 (453) 486-4378
People (6)
  • 460ff4620fa44cba8df530afde949785@sentry.wixpress.com✉︎
  • 79baaa8e09c746d2b7401643b99792e0@sentry.wixpress.com✉︎
  • 8c4075d5481d476e945486754f783364@sentry.io✉︎
  • 8eb368c655b84e029ed79ad7a5c1718e@sentry.wixpress.com✉︎
  • dd0a55ccb8124b9c9d938e3acf41f8aa@sentry.wixpress.com✉︎
  • General Contact · Main Office📞✉︎

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260416992026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/athena-construction-services-project-08-26-16-pasco-fl-8d1aca0c