Leads/at-t-mobility-project-pt-e-1-2-sw-1-4-03-31-30-polk-fl-77737415
Approved · unknownPolk County

Mastec Network Solutions project — 18861 HWY 60 E

18861 HWY 60 E, Lake Wales, FL 33898

Load estimate pending
Lifecycle
Permitted as of Jun 16, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mastec Network Solutions project — 18861 HWY 60 E

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Parcel 30-31-03-000000-042180
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
MASTEC NETWORK SOLUTIONS LLC
📞 (321) 209-8800
Developer / Applicant
AT&T MOBILITY
Why this is a hauling opportunity: NOC — unclassified description: PT E 1/2 SW 1/4 03-31-30 | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-11POLK_NOC
    Captured Polk_2026143619 from polk_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Lake Wales Dry Plant · Davenport
One-way
13.6 mi
Round trip
27.1 mi
TypeNameCityOne-wayRT mi
sand pitLake Wales Dry PlantDavenport13.6 mi27.1
sand pitLake Wales Sand MineBrooksville13.6 mi27.1
sand pitDiamond Sand PlantJacksonville13.7 mi27.3
sand pitHaines City MineDavenport24.7 mi49.5
quarrySouth Fort Meade MineLithia29.4 mi58.8
sand pitSILICA PLANTDavenport31.3 mi62.5
sand pitDavenport Sand MineBrooksville31.3 mi62.7
quarryFLINT PLANTDavenport31.7 mi63.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
AT&T MOBILITY
Contractor
MASTEC NETWORK SOLUTIONS LLC
2 active projects · Hillsborough
~456 est. loads · fill dirt
📞 (321) 209-8800

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
polk_nocPolk_20261436192026-07-11Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
30-31-03-000000-042180
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/at-t-mobility-project-pt-e-1-2-sw-1-4-03-31-30-polk-fl-77737415