Leads/and-services-project-8303-fountain-ave-tampa-fl-33615-hillsborough-fl-2a46e6eb
Approved · unknownHillsborough County

NOC – Sherry Silk | And Services | 8303 Fountain Ave

8303 Fountain Ave, Tampa, FL 33615

~4loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Oct 16, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Sherry Silk | And Services | 8303 Fountain Ave

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
0.031 ac
Parcel 0079290000
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor
AND SERVICES
📞 (813) 445-4818
Developer / Applicant
SILK SHERRY
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Whole House Reome | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025445989 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_0079290000_88a9fd17 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.7 mi
Round trip
19.3 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa9.7 mi19.3~40m$110–$140
quarryCentral State Aggregates LLCZephyrhill21.7 mi43.4~75m$175–$230
quarryCaloosa MaterialsRuskin22.8 mi45.6~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 26.5 mi52.9~100m$230–$290
sand pitCounty Line MineSpring Hill29.1 mi58.3~100m$230–$290
quarryBrooksville QuarryBrooksville40.4 mi80.7~130m$290–$370
quarryFour CornersLithia40.7 mi81.4~130m$290–$370
quarryBrooksville South Cement PlantBrooksville40.8 mi81.6~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
SILK SHERRY
Contractor
AND SERVICES
8 active projects · Hillsborough
~2 est. loads · fill dirt
📞 (813) 445-4818

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20254459892026-05-21Open ↗
hcpaHCPA_0079290000_88a9fd172026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0079290000
Strap
U-35-28-17-0CU-000057-00002.0
Address
8303 FOUNTAIN AVE, TAMPA
Zip
33615
Acreage
0.031 ac
Sq ft
1,338
Homestead
YES
8303 FOUNTAIN AVE, TAMPA
Owner of record
SILK SHERRY
Last sale
2019-07-29
$296,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/and-services-project-8303-fountain-ave-tampa-fl-33615-hillsborough-fl-2a46e6eb