Leads/american-modular-project-7-24-17-pasco-fl-41f9b04e
Approved · unknownPasco County

AMERICAN MODULAR project — 7-24-17

7-24-17

~1.6kloads
fill dirt + base rock
11 wk
Lifecycle
Permitted as of Jun 3, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

AMERICAN MODULAR project — 7-24-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$2.4M
Actual — from source record
Acreage
11.69 ac
Parcel 07-24-17-0030-00000-3030
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
AMERICAN MODULAR
📞 (727) 378-4735
Developer / Applicant
QUARRIE JENNIFER LYNN
Why this is a hauling opportunity: NOC — unclassified description: 7-24-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 12 ac disturbed, $2,351,948 valuation, ~1624 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 12 ac disturbed, $2,351,948 valuation, ~1624 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 12 ac disturbed, $2,351,948 valuation, ~1624 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 12 ac disturbed, $2,351,948 valuation, ~1624 est. loads (+25) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025106117 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_07-24-17-0030-00000-3030_027d523d from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_07-24-17-0030-00000-3030_027d523d from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
4.7 mi
Round trip
9.3 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill4.7 mi9.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 9.4 mi18.9
quarryBrooksville QuarryBrooksville17.0 mi34
quarryBrooksville South Cement PlantBrooksville17.9 mi35.8
quarryCalcium PlantJacksonville20.3 mi40.6
quarryCenter Hill MineBrooksville24.6 mi49.2
quarryCentral State Aggregates LLCZephyrhill25.5 mi50.9
quarryLecanto MineCrystal River29.4 mi58.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
QUARRIE JENNIFER LYNN
Contractor
AMERICAN MODULAR
4 active projects · Pasco
~1,624 est. loads · fill dirt
📞 (727) 378-4735

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251061172026-05-21Open ↗
fl_dor_cadastralFDOR_07-24-17-0030-00000-3030_027d523d2026-05-28Open ↗
pascopaPASCOPA_07-24-17-0030-00000-3030_027d523d2026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
07-24-17-0030-00000-3030
Strap
07-24-17-0030-00000-3030
Address
10501 BECOMING DRIVE, HUDSON
Zip
34667
Acreage
11.69 ac
Sq ft
509,216
Owner of record
KAPPAS DENNIS &
KAPPAS PROPERTIES INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$2,350,778

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/american-modular-project-7-24-17-pasco-fl-41f9b04e