Leads/amaral-andrew-project-31-25-17-pasco-fl-8eec24bc
Approved · unknownPasco County

XPRESS EXTERIOR DESIGN LLC project — 31-25-17

31-25-17

Load estimate pending
Lifecycle
Permitted as of Oct 10, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

XPRESS EXTERIOR DESIGN LLC project — 31-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor
XPRESS EXTERIOR DESIGN
Developer / Applicant
AMARAL ANDREW
Why this is a hauling opportunity: NOC — unclassified description: 31-25-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2023179055 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
12.4 mi
Round trip
24.7 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill12.4 mi24.7~55m$140–$175
quarryGeorgia Stone Spring Hill QuarryAtlanta 12.5 mi25~55m$140–$175
quarryCentral State Aggregates LLCZephyrhill21.5 mi43~75m$175–$230
quarryBrooksville QuarryBrooksville25.1 mi50.2~100m$230–$290
quarryTampa Cement Grinding PlantTampa25.8 mi51.6~100m$230–$290
quarryBrooksville South Cement PlantBrooksville25.8 mi51.6~100m$230–$290
quarryCalcium PlantJacksonville28.7 mi57.4~100m$230–$290
quarryCenter Hill MineBrooksville32.2 mi64.3~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
AMARAL ANDREW
2 active projects · Pasco
Contractor
XPRESS EXTERIOR DESIGN

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20231790552026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/amaral-andrew-project-31-25-17-pasco-fl-8eec24bc