Leads/aeb48dff
Approved · unknownBroward County

Beach nourishment — VDMEJ Beach SP-Dania Beach-Hollywood-Hallandale (59,840 cy)

VDMEJ Beach SP-Dania Beach-Hollywood-Hallandale, Broward County, FL

Load estimate pending
Lifecycle
Completed as of Feb 1, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Beach nourishment — VDMEJ Beach SP-Dania Beach-Hollywood-Hallandale (59,840 cy)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$718K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Beach nourishment Broward County Shore Protection Project — 59,840 cy placed. Source: Upland. Type: Nourishment. Counties with prior nourishment cycle every 6-10 years. | size signal: (+5) | size signal: (+5) | size signal: $718,080 valuation (+5) | size signal: $718,080 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SAND_PLACEMENT
    Captured FDEP_SANDPLACE_428 from fdep_sand_placement

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
FEC QUARRY · MIAMI
One-way
17.5 mi
Round trip
35 mi
TypeNameCityOne-wayRT mi
quarryFEC QUARRYMIAMI17.5 mi35
quarryPENNSUCO QUARRYMedley17.9 mi35.9
quarryPENNSUCO CEMENT PLANTMedley17.9 mi35.9
quarryWHITE ROCK QUARRIESWest Palm Beach18.1 mi36.2
quarryEpic Stoneworks, Inc.Cutler Bay20.5 mi41.1
quarryMiami QuarryJacksonville22.0 mi43.9
quarryMiami Cement PlantMiami24.1 mi48.3
quarryKrome QuarryMIAMI31.6 mi63.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Broward County Permits
Fort Lauderdale area Building Division
ConnectorRecord IDCapturedLink
fdep_sand_placementFDEP_SANDPLACE_4282026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/aeb48dff