Leads/acc8a1a5
Approved · unknown

CCCL — Beach Scraping (Alan Christy)

5801 Thomas Drive, Panama City Beach

Load estimate pending
Lifecycle
Permitted as of Oct 13, 1995
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Beach Scraping (Alan Christy)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (30y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8006827 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
COASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO) · Panama City Beach
One-way
7.4 mi
Round trip
14.8 mi · ~40 min
Rate / load
$110–$140
Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
22.2 mi
Round trip
44.4 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitSandhills Plant 2Dothan22.2 mi44.4~75m$175–$230
sand pitPanama City QuarryMurfresboro34.1 mi68.1~100m$230–$290
sand pitMVM Landfill, LLCDeFuniak Springs42.5 mi85~130m$290–$370
quarry1874 MariannaHammond49.3 mi98.6~130m$290–$370
quarryROCKY CREEK MINE AND MILLMarianna49.6 mi99.1~130m$290–$370
transfer stationCOASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO)Panama City Beach7.4 mi14.8~40m$110–$140
landfillLYNN HAVEN C&D DISPOSAL FACILITYPanama City16.4 mi32.7~75m$175–$230
landfillSOUTHPORT C&D DISPOSAL FACILITYSouthport17.3 mi34.6~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80068272026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/acc8a1a5