Leads/abrams-group-construction-project-12-25-17-pasco-fl-49dea8d6
Approved · unknownPasco County

ABRAMS GROUP CONSTRUCTION project — 12-25-17

12-25-17

Load estimate pending
Lifecycle
Permitted as of Nov 20, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ABRAMS GROUP CONSTRUCTION project — 12-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
ABRAMS GROUP CONSTRUCTION
📞 (850) 994-7980
Developer / Applicant
U HAUL CO OF FLORIDA
The story

Abrams Group Construction is undertaking a site development earthwork project in Florida that has just received permit approval, representing a high-priority hauling opportunity with a 75/100 score. The project will require significant material movement and site preparation, making it ideal for hauling providers specializing in excavation debris and fill materials. Contact Abrams Group Construction directly at (850) 994-7980 as the prime general contractor to discuss hauling needs, or reach out to U Haul Co of Florida as the owner-developer.

Why this is a hauling opportunity: General contractor NOC: ABRAMS GROUP CONSTRUCTION | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025219543 from pasco_noc
  2. 2026-05-21PASCO_NOC
    Captured Pasco_2025219544 from pasco_noc
  3. 2026-05-21PASCO_NOC
    Captured Pasco_2025219545 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
6.1 mi
Round trip
12.2 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 6.1 mi12.2
sand pitCounty Line MineSpring Hill7.6 mi15.1
quarryCentral State Aggregates LLCZephyrhill18.1 mi36.1
quarryBrooksville QuarryBrooksville19.3 mi38.6
quarryBrooksville South Cement PlantBrooksville19.9 mi39.8
quarryCalcium PlantJacksonville23.0 mi46
quarryCenter Hill MineBrooksville26.1 mi52.1
quarryTampa Cement Grinding PlantTampa27.7 mi55.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
U HAUL CO OF FLORIDA
Hauler
2311 ANGEL OLIVA SENIOR ST. C/O U-HAUL INTERNATIONAL TAMPA, FL 33605
People (1)
  • ROBERT S · PD MAGYAR
Contractor
ABRAMS GROUP CONSTRUCTION
2 active projects · Pasco
📞 (850) 994-7980

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20252195432026-05-21Open ↗
pasco_nocPasco_20252195442026-05-21Open ↗
pasco_nocPasco_20252195452026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/abrams-group-construction-project-12-25-17-pasco-fl-49dea8d6