Leads/aa5de25a
Approved · planning

800 BROADWAY DOCK RECONFIG

800 BROADWAY ST, LONGBOAT KEY, FL, 34228

Load estimate pending
Lifecycle
Permitted as of Mar 30, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

800 BROADWAY DOCK RECONFIG

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
800 BROADWAY LLC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (10y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0212412-005-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
8.6 mi
Round trip
17.1 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
23.4 mi
Round trip
46.9 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin23.4 mi46.9~75m$175–$230
quarryWingate Creek MineLithia34.4 mi68.9~100m$230–$290
quarryTampa Cement Grinding PlantTampa37.2 mi74.5~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples39.9 mi79.7~100m$230–$290
quarrySouth Pasture MineLithia47.1 mi94.3~130m$290–$370
quarryFour CornersLithia48.9 mi97.8~130m$290–$370
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton8.6 mi17.1~40m$110–$140
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota10.3 mi20.5~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
800 BROADWAY LLC

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0212412-005-EI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/aa5de25a