Leads/aa0f8256
Approved · unknownDuval County

FDOT — SR109(UNIVERSITY BLVD) FROM SR13(SAN JOSE BLVD) TO I-95 - RE SURFACING

Duval County — FDOT Contract T2965

Load estimate pending
Lifecycle
Completed as of Aug 2, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR109(UNIVERSITY BLVD) FROM SR13(SAN JOSE BLVD) TO I-95 - RE SURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$918K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR109(UNIVERSITY BLVD) FROM SR13(SAN JOSE BLVD) TO I-95 - RE SURFACING. Vendor: PREFERRED MATERIALS INC.. Cost: $917,794. | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: $917,794 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T2965_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
WATER RECOVERY, LLC · Jacksonville
One-way
4.4 mi
Round trip
8.9 mi · ~25 min
Rate / load
$85–$110
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
9.6 mi
Round trip
19.3 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryDames Point TerminalBrooksville9.6 mi19.3~40m$110–$140
quarryThe Chemours Company FC LLCStarke34.8 mi69.6~100m$230–$290
sand pitGoldhead Sand PlantJacksonville36.4 mi72.9~100m$230–$290
quarrySRM Materials East PalatkaMurfresboro40.2 mi80.4~130m$290–$370
sand pitGrandin Sand PlantJacksonville41.0 mi81.9~130m$290–$370
sand pitKeuka Sand PlantJacksonville47.7 mi95.5~130m$290–$370
transfer stationWATER RECOVERY, LLCJacksonville4.4 mi8.9~25m$85–$110
transfer stationREALCO RECYCLING CO., INC. MRFJacksonville9.7 mi19.4~40m$110–$140
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Duval County Permits
Jacksonville Building Inspection Division
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T2965_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Duval
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/aa0f8256