Leads/a944bbee
Approved · unknown

CCCL — Single Family Dwelling (George D. & Linda G. Plymel)

764 W. Gorrie Dr., St. George Island

Load estimate pending
Lifecycle
Permitted as of Nov 6, 2015
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Single Family Dwelling (George D. & Linda G. Plymel)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (10y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_FR000919 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
FRANKLIN COUNTY CENTRAL LANDFILL · Eastpoint
One-way
8.7 mi
Round trip
17.4 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint8.7 mi17.4~40m$110–$140
landfillFIVE POINTS CLASS III LANDFILLPort St Joe26.2 mi52.4~100m$230–$290
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe27.5 mi54.9~100m$230–$290
landfill(unnamed)8.7 mi17.4~40m$110–$140
landfill(unnamed)10.0 mi19.9~40m$110–$140
landfill(unnamed)11.3 mi22.6~55m$140–$175
landfill(unnamed)26.2 mi52.4~100m$230–$290
landfill(unnamed)27.5 mi54.9~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_FR0009192026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/a944bbee